IT EN

Supply tariffs

Acea Ato 5, for municipalities managed by Frosinone and province.

Acea Ato 5 water tariffs for Frosinone Acea Ato 5 water tariffs for Frosinone Acea Ato 5 water tariffs for Frosinone

Acea Ato5 – operating in the managed municipalities of Frosinone and its metropolitan area – applies the Integrated Water Service Tariff pursuant to Arera Resolutions nos.  639/2023/R/IDR and Resolution no. 1 of 22/10/2024 approved by the Conference of Mayor of the ATO no. 5 of Southern Lazio – Frosinone.

The 2023 tariff range in force from 01/01/2023 is given below.

Average annual consumption

As required by ARERA regulation 609/2021/R/idr, the average annual consumption of end users recorded in the managed territory and divided by type of user are available at the following link:

Read more

Seismic events: resident domestic rate

With Resolution 34/2022/R/COM, ARERA extends the facilitation measures in favour of the populations affected by the seismic events in Central Italy and in the Municipalities of Casamicciola Terme, Lacco Ameno and Forio (Ischia) in 2016 and 2017.
 

Discover more

Costs for water use

Acea Ato 5 has recalculated the supply fees to apply according to the various user activities. The result of the analysis is based on an estimate of the cost of personnel in charge of the activity in proportion to the time taken to carry out the service required.
The table lists the cost items to be charged to the user for each individual service starting from 1 April 2018.


TYPE OF SERVICE
 
AMOUNT VAT

Visual check of the water meter by Acea’s staff with negative result 

85,00 €

10%

Check of the water pressure

58,00 €

10%

Survey of sewer manhole elevations and sewer colorimetric tests

86,00 €

10%

Replacement of the meter on customer request (meter less than 10 years old)

65,00 €

10%

Copy of official acts (e.g., certificates and clearance)

32,00 €

10%

Hydraulic clearance for production sites

137,00 €

10%

Copy of official commercial acts

72,00 €

10%

Supply of the complete stainless-steel door for the housing of the meter 27x47, (replacement)

62,00 €

22%

Supply of the complete stainless-steel door for the housing of the meter 37x77

95,00 €

22%

Supply of the complete stainless-steel door for the housing of the meter 49x89

130,00 €

22%

Supply of the stainless-steel door key (replacement)

10,00 €

22%

Supply of the stainless-steel door lock (replacement)

23,00 €

22%

Cost forecasting for new connections

Quote for new water connections

DESCRIPTION

PRICE

UNIT

VAT

Central water connection (up to 10 m) ND 25 on paved road

1.956,28 € 

each

10%

For each additional meter ND 25 over 10 m on paved road

242,56 € 

m

10%

Central water connection (up to 10 m) ND 50 on paved road

2.055,93 € 

each

10%

For each additional meter ND 50 over 10 m on paved road

262,02 € 

m

10%

Central water connection (up to 10 m) ND 25 on unpaved road

1.512,42 €

each

10%

For each additional meter ND 25 over 10 m on unpaved road

157,75 € 

m

10%

Central water connection (up to 10) ND 50 on unpaved road

1.577,75 € 

each

10%

For each additional meter ND 50 over 10 m on unpaved road

177,22 € 

m

10%

Manifold connection (for a first meter) 

147,42 € 

each

10%

Manifold connection (for each subsequent meter on the same request)

72,54 € 

each

10%

Quote for new sewer connections

DESCRIPTION

PRICE

UNIT

VAT

Sewer connection to the building (up to 3 m) without a line manhole on paved road

1.823,90 € 

each

10%

Sewer connection to the building (up to 3 m) with a line manhole on paved road

3.043,23 € 

each

10%

For each additional meter over 3 m on paved road

291,74 € 

m

10%

Sewer connection to the building (up to 3 m) without a line manhole on unpaved road

1.454,49 € 

each

10%

Sewer connection to the building (up to 3 m) with a line manhole on unpaved road

2.673,82 € 

each

10%

For each additional meter over 3 m on unpaved road

184,31 €

m

10%

Highlights