Below is the main information on the plant’s performance, emissions data and the certificates achieved.

Terni plant: summary data

Area served: national territory

40
people
employed
1
Waste-to-energy lines
52
MWt
Installed thermal power
13.6
MWe
Installed electrical power
436
Mwh
Electricity generated by photo-voltaic facilities
100,000
t/year
AUTHORIZED CAPACITY for ENERGY RECOVERY *

Waste-to-energy pulper: 82,217t/year
Electricity produced in 2023: 70.78 GWh

* the maximum waste capacity authorized for pre-treatment is 120,000 t/year

Certifications

Click here to read all certifications and environmental declarations.

Real time emissions data of Terni

Dati non utilizzati per l'elaborazione delle misure fiscali

Highlights

Discover the latest news and initiatives of the Acea Group