The project involves the construction of a new biofiltration macro-module in the Roma Sud Purification Plant. This new system is located between the existing second biofiltration line (modules 3 and 4) and the second primary sedimentation section.

Project details:

  • Structure of the macro-module
    • Composed of two parallel modules.
    • Each module is divided into multiple unit filtration cells.
  • Processing capacity
    • The two new modules can handle a total flow rate of approximately 2 m³/s.

With the creation of the two new modules, it is possible to carry out a secondary treatment on the entire incoming flow and complete all the interventions on the sewage line provided for in the general plant adaptation plan. In addition, the new system guarantees a significant increase in the overall purification efficiency, and provides an adequate safety margin compared to possible out-of-service treatment units, ensuring continuity of service.

Details and key numbers of the service

Service performed:

  • Engineering services during the execution of works (Works Management).
  • Procurement of services and supplies, and the coordination of all the work necessary to provide the Customer with the finished work in a state-of-the-art manner.

Key numbers:

  • Service execution quota: 100% Acea Infrastructure SpA
  • Amount of works: €40,000,000 (of which €1,497,300 are for security costs)
  • Maximum potential of the new sector: 2.34 m3/s
  • Number of modules: 2
  • Number of filters per module: 8
  • Filter unit area: approx. 100 m2
  • Module Size: Length BIOFOR C+N 12.68 m, Width BIOFOR C+N 7.95 m, Height 6.09 m
  • Biofilter Technology: up flow