New Peschiera Aqueduct
The project involves the construction of a new biofiltration macro-module in the Roma Sud Purification Plant. This new system is located between the existing second biofiltration line (modules 3 and 4) and the second primary sedimentation section.
Project details:
With the creation of the two new modules, it is possible to carry out a secondary treatment on the entire incoming flow and complete all the interventions on the sewage line provided for in the general plant adaptation plan. In addition, the new system guarantees a significant increase in the overall purification efficiency, and provides an adequate safety margin compared to possible out-of-service treatment units, ensuring continuity of service.
Service performed:
Key numbers:
Discover the latest news and initiatives of the Acea Group
Acea for World Energy Saving Day
Visit the virtual museum about the history of the Acea Group
The channel for the commercial requests on land urbanisation
Acea turns the spotlight on the Rome Film Festival 2023
Acea is in the "Gold class" in the .trust research
Read more about our culture of inclusiveness