New Peschiera Aqueduct
The construction site of the New Peschiera Aqueduct is divided into 17 construction site areas distributed along the path of the aqueduct that goes from the springs of the Peschiera river to the Salisano Power Plant.
Project details:
The complexity of the work includes a variety of processes, among which the following stand out for their particularity:
The complexity and extent of the works planned for the New Peschiera Aqueduct have made necessary a continuous dialogue between the Safety Coordinator during the Design phase and the design staff. This collaboration was essential to plan the logistics of the site areas and the multiple work phases, as well as to elaborate the planimetric and detailed drawings for the different operational phases.
In light of the numerous and different work activities, a Safety and Coordination Plan has been defined, which is structured so as to be usable in the various areas of the construction site subject to intervention. The plan also includes the transitional work phases necessary to ensure safety during the execution of the works and to keep the existing aqueduct in operation.
Service performed:
Key numbers:
Discover the latest news and initiatives of the Acea Group
Acea for World Energy Saving Day
Visit the virtual museum about the history of the Acea Group
The channel for the commercial requests on land urbanisation
Acea turns the spotlight on the Rome Film Festival 2023
Acea is in the "Gold class" in the .trust research
Read more about our culture of inclusiveness