Description and objectives

The project aims to improve the sludge line of the "La Chiusa" sewage purification plant in Velletri, which serves a large part of the municipal territory with a capacity of 40,000 equivalent inhabitants (e.i.). This intervention is aimed at complying with the limits established by Legislative Decree 152/06 and the Regional Water Protection Plan (RWPP) of Lazio, thus protecting the receiving water body, Fosso della Regina.

Project Objectives:

  • Adapt the system to comply with current regulations.
  • Improve the efficiency of sludge treatment.
  • Reduce odour emissions and improve air quality.
  • Increase the safety and functionality of the system.

Planned Interventions:

  • Medium and fine sieving
    • Improvements in sieving units to filter debris.
  • Rainwater treatment
    • Creation of a section dedicated to rainwater treatment.
  • Treatment of waste sludge
    • Construction of a new aerobic stabilisation basin.
    • Installation of a circular thickening tank.
    • Replacement of the existing press belt with a new high-performance centrifuge.
    • Construction of a containment box for the sludge box.
  • Covers and air treatment
    • Installation of aluminium covers on the sludge thickening and stabilisation tanks.
    • Installation of an air treatment system for these units and for mechanical dehydration.
  • Carpentry and equipment
    • Installation of metal structures, iron works, electromechanical equipment and machinery for treatment units.
  • Deodorisation
    • Creation of a new section for the deodorisation of emissions, using a biofilter and a scrubber.
  • Adjustment of the medium/low voltage transformer section
    • Installation of a new MV panel and two 800 kVA transformers.
    • Construction of a new prefabricated concrete box for the LV general framework.
  • Internal viability and arrangement of green areas
    • Expansion and arrangement of internal roads.
    • Creation of new flooring, tree planting and reprofiling of the escarpment behind the current digestion basin.
  • Provisional works
    • Securing a dangerous building by means of wooden restraint underpinning.

Details and key numbers of the service

Service performed: Executive project

Key numbers:

  • Service execution quota: 100% Acea Infrastructure SpA
  • Work Amount: €10,338,000 including security charges
  • Sewage purification plant potential: 40,000 equivalent inhabitants